 |
The fuel & water tanks were all cut to shape
including baffles and hatches for tank tops & were welded & tested before being
installed in boat. |
Pilot house sole framing was all supplied in the
STEEL OR ALUMINUM PLANS & CUTTING FILES. |
Pilot house sole framing was all supplied in the STEEL OR ALUMINUM PLANS & CUTTING FILES. |
 |
General view of the hull as welding nears completion
on the outer shell. |
 |
General view of strong frames and stringers in
forward section of hull - note strengthed forward bulkhead with access hatch. |
 |
All hatches bulkhead and deck hatches are suitably
strengthened. |
 |
In this case the bow thruster unit was supplied as
part of the STEEL OR ALUMINUM PLANS & CUTTING FILES - here we see the supplied aluminum tube welded on position. |